Bracing with intumescent coating (one-sided) to support the cover in the joint area of the BSKM 1025. In the wall opening, 2 pieces are to be arranged on each side of the predetermined breaking point, and in the case of duct connections, 1 piece is to be arranged centrally above the joint.