Duct cover for creating a designer device installation duct from the GAD series. Style design for completely covering the system opening and the switching and plug-in devices. The GAD OTA top section adapters are mandatory and should be planned at a maximum distance of 50 cm along the duct section. A GAD OTD spacer must be placed between the channel covers.