The PlusLink distributor is required if signals from one PlusLink line are to be distributed to other PlusLink lines on different phases. e.g. from PL1 (on L1) to PL2 (on L2) or PL2 (on L3). This only happens in one direction. This means that several PlusLink distributors may be required. The device ensures galvanic isolation between the phases. Suitable for mounting on TH35 top hat rails in accordance with EN 60715. With screw terminals. Nominal voltage: AC 220/230 V. Neutral conductor: required (3-conductor system). Connection cross-section: max. 2.5 mm2. Device width: 1 HP = 18 mm.